stainless steel fabrication

Client: New Bottle Water Manufacturing Facility
Status: Complete
Location: Arizona
Project Manager: Rob Pasour
Superintendent: Lee Hickman

Wayne Brothers Processing Group, installed all the Process and Utility Piping at this new facility, consisting of 304 and 316 stainless steel tubing, plus schedule 40 and 80 carbon steel.

Wayne Brothers Processing Group rigged and set all the process and utility equipment: Silos, Water Treatment Equipment, AC Towers, RO, CIP, Mineral Injection skids, Air Compressor, Cooling Towers, Heat Exchangers, Pump skids and Chillers.

Attention to detail is why this customer used The Wayne Brothers Process Integration Group on this project and several since. Utilizing Clean Design on hangers, supports for equipment and piping installation are standards for the Process Integration Team. This customer not only continues to utilize The Wayne Brothers Process Integration Group on complex projects but displays our work in bid packages as the correct method of installation.