Client: Rodgers Builders
Status: Complete
Location: Mooresville, NC
Scope: Turnkey Concrete
Project Manager: Isaiah Wayne
Superintendent: Jason Loucks
Phase I
The Customer Support Center totaled 408,000 square feet with five floors. WBI’s scope of work included buildings and site wall foundations. The foundation concrete totaled approx 5000 cubic yards. In only ten (10) weeks we completed over 3000 cubic yards of footings, and 1,200 linear feet of 20 foot high wall using a gang forming system. All building foundations were 100% ready for steel erection in ten weeks.
Phase II
Our scopeof work included foundations, cast-in-place walls, SOG, and SOMD concrete construction in the 130,000sf headquarters addition. Also included was an expansion of the Parking Deck, which utilizes Smart Beam construction with SOG, and SOMD construction.
Phase III
700,000sf office space at the headquarters. Our scope-of-work also included construction of foundations, walls, slab-on-grade, and slab-on-metal-deck construction of the new Central Energy Plant and Office buildings. A major portion of the work consisted of large cast-in-place site wall around the office buildings. Total concrete material on Phase III is around 12,000 cy. Lowe’s Planogram Facililty: Turnkey concrete package consisted of foundations, slabs, concrete tilt-up wall panels, and exterior concrete pavement for the 104,000 sf facility. Lowe’s uses this facility for vendors to set up and display their products as they will be placed in their home improvement stores nationwide.