| Client: |
Lend Lease
|
Project Status: |
Complete |
| Project Location: |
Winston-Salem, NC |
Project Completion: |
2012 |
| Project Manager: |
John Vaughan |
Superintendent: |
Bill Parrish |
WBI's scope of work on this project consists of 230,000+ sq ft of slab on metal deck, 42,000 sq ft of 1.5" topping slab, interior & exterior concrete curbs, housekeeping pads, concrete paving, curb & gutter, asphalt paving and sidewalks. The slab on metal decks began in September and only a few in-fills remain. This project had many logistical challenges. The vertical expansion began on the 5th floor of an existing cast in place concrete structure and from there a new steel structure was constructed to the 12th floor. The existing 5 story Cancer Center has remained operable throughout the construction period. The only two access points for the project both had loading docks that supplied other sectors of the hospital that had to remain open 16 hours of the day. WBI's finishing crew was left with only 8 hours(8pm-4am) to set up and place the concrete slabs. Some of the deck pours had over 330 cubic yards of concrete. A total of 3,200 cubic yards of concrete have been placed without interference to the hospital. WBI crews will be working on and off this summer until fall of this year to complete the remaining scope of work . This project would not have been a success without the around-the-clock support of Lend Leases' project team, WBI's finishing group with leadership from Kevin Steele, WBI's Superintendent Bill Parrish, Foreman Joaquin Reveles and WBI's project team. Thanks to everyone else involved in helping make this project a success!